Richland Center WWTF

Construction of a new main lift station with deep wet well at the existing wastewater facility site which included installation of a submersible pumping system; emergency generator; large diameter piping; and renovations to the existing storage tank. Interceptor and force main piping.

Remodeling of the existing control building.

Construction of new structures at the proposed facility site including: Headworks’ building; primary clarifiers; aeration basins; blower building; final clarifiers; UV disinfection structure; sludge processing building; anaerobic digesters; cake solids drying and storage pads; septage receiving station administration building; and service garage.

CLIENT
City of Richland Center, WI 450 South Main Street
DURATION
Start date May 2014 Completion date May 2016
SERVICES
Project Management, Earthwork & Site Utilities, Building, Concrete, Process Mechanical, BIM/Fabrication
COST
20M