Marshfield Utilities Combustion Turbine Peak Plant

Construct 52.5 MW combustion turbine peak plant and 115kV substation electrical transmission substation. Concrete foundation for a dual fuel twin jet engine turbine, bolted steel water tank, structural steel pump/maintenance shop, metal substation control building, liquid fuel unloading station, electrical sub grid, & liquid fuel storage tank and containment pit. H-Piling to support electrical grid and turbine engine concrete foundation. Storm sewer drainage system & HDPE/SS/Dual Contained CS process piping system.

CLIENT
City of Marshfield, WI
DURATION
2009 – 2010
SERVICES
Project Management, Earthwork, Site Utilities, Building, Process Equip & Piping.
COST
$1.2M