Green Bay Lift Station
Construction and installation of a storm lift station which includes two (2) precast concrete structures and one (1) cast-in-place concrete structure, electrical work for the lift station, above ground lift station building enclosure; installation of three (3) pumps, associated piping, and control panel; approximately 215 lineal feet of 29” x 45” elliptical reinforced concrete storm sewer; 60 lineal feet of 15” reinforced concrete storm sewer; reconstructing 260 square yards of 8” concrete pavement.
CLIENT | City of Green Bay, WI |
DURATION | 2019-2020 |
SERVICES | Construction Management, Building, Dewatering, Earthwork, Site Utilities, Earth Retention, Process Equipment & Piping |
COST | $1M |