Fort Collins Sanitation District Phase 1
South Fort Collins Sanitation District Phase 1 SCC Fabrication was contracted to supply fabricated pipe for the modification to a water reclamation facility centered around
South Fort Collins Sanitation District Phase 1 SCC Fabrication was contracted to supply fabricated pipe for the modification to a water reclamation facility centered around
City of Greeley-Water Pollution Control Facility Provide fabricated exterior stainless steel and interior carbon steel blower piping. Pipe sizes ranged from 12 – 36” in
Spirit Dam Phase 1 Seepage Repair Construct access road, earthen embankment restoration, furnish and install 50’ to 60’ long steel sheet pile approx. ¼ mile
Stoughton 4th Street Dam Construct additional spillway near existing dam, replacing existing spillway piers, walkway, concrete stability, embankment riprap, and replacement of three slide gates.
Minong Dam Reconstruction Construct additional spillway near existing dam, replacing existing spillway piers, walkway, concrete stability, embankment riprap, and replacement of three slide gates. CLIENT
Green Bay Lift Station Construction and installation of a storm lift station which includes two (2) precast concrete structures and one (1) cast-in-place concrete structure,
STH 165 Lift Station Replacement The Work includes construction of a sanitary lift station (cast-in-place, two-level structure, wet well, and pigging vault) with submersible pumps,
Marshfield Utilities Combustion Turbine Peak Plant Construct 52.5 MW combustion turbine peak plant and 115kV substation electrical transmission substation. Concrete foundation for a dual fuel
Lodi Booster Station The project consists of the construction of a water booster station addition to the City of Lodi, Wellhouse No. 4, including the
Sun Prairie WWTF- Digester Piping Remove carbon steel gas collection piping in Digester and replace with stainless steel piping. Also, refurbished existing piping supports CLIENT