Marshfield Utilities Combustion Turbine Peak Plant

Construct 52.5 MW combustion turbine peak plant and 115kV substation electrical transmission substation. Concrete foundation for a dual fuel twin jet engine turbine, bolted steel water tank, structural steel pump/maintenance shop, metal substation control building, liquid fuel unloading station, electrical sub grid, & liquid fuel storage tank and containment pit. H-Piling to support electrical grid and turbine engine concrete foundation. Storm sewer drainage system & HDPE/SS/Dual Contained CS process piping system.